Baku metro, which was put into operation on November 6, 1967 is the public urban transport system linking underground railway lines in Azerbaijan.
The current metro lines of 36,63 km length, consist of 25 stations on 3 lines, an electrical depot and technological corps (building) where the administrative apparatus is located as well.

Address & Contact

Address:

Baku

GPS:

40.4094772, 49.8672221

Telephone:
Email:

-